![]() This work is needed to complete connections between the current 1-Line service and new 2-Line tracks that will link riders to the Eastside. Trains will be single tracked through the DSTT and train frequencies will be reduced to 20 minutes. stations with a Link bus shuttle connecting passengers between these two stations.Ī period of at least three weeks in Q4 2022 In order to repair and replace the overhead catenary system, Link will be shut down between Rainier Beach and Tukwila International Blvd. ![]() until end of revenue service, a Link bus shuttle will be available to connect passengers between Capitol Hill Station and SODO Station. 13Īs a result of work on the overhead catenary system in the Downtown Seattle Transit Tunnel (DSTT), train frequencies will be reduced to 20 minutes in each direction until 11 p.m. In order to replace tile at the Columbia City Station, train frequencies will be reduced to 20 minutes in each direction during all operating hours during the closure of one track, requiring all trains to use a single track between Mount Baker and Tukwila. Sound Transit listed the important dates and details of work being done for the first two phases: July 11 to July 24 and Aug.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |